The Tennessee Titans football organization required a new sidewalk and path alongside a lake to connect the existing practice facility with new office space in an annex across the street. Hayward Baker worked with PBG Builders, Inc. to install helical piles for the deep foundations system.
The required width of new concrete pavement would extend beyond the top of the steeply sloping, rock-covered lake embankment. Very soft clayey saturated subsurface soils extended to a depth of 40+ ft below the rock fill.
THE CHALLENGE
The alignment of the sidewalk was underlain by utilities and squeezed between the embankment and a four-lane divided roadway, limiting the options for support of the subsurface soils. Excavation of the rock fill to enable construction of a retaining wall was discounted since this would require a lengthy and complicated permitting process and a stringent degree of water safety during sidewalk construction.
THE SOLUTION
Following a detailed utility identification process at each location, HBI installed a series of vertical and slightly battered helical piles to a depth of 40 ft to accommodate the outboard loads and prevent sliding. Each pile was designed for a maximum capacity of 25 kips. HBI worked with the general contractor to finalize the design and construction of the piles. Post-construction inspections indicated the new concrete path performed well under repeated golf cart and pedestrian traffic with the piles effectively resisting lateral loads.
Hayward Baker finalized the design, safely circumvented utility lines beneath the sidewalk alignment, and completed the foundation support in just four days, including mobilization and demobilization.
Please visit Titan's Practice Facility Sidewalk if you want to find out more about this project.
Source: Hayward Baker
Source: Hayward Baker
Hayward Baker worked on a sheet pile & helical pile installation in restricted access conditions...
Hayward Baker, Inc., a Keller Company, helps owners and developers overcome challenging foundation...
BACKGROUND Built in 1901, the historic train station is located in Downtown Richmond. The city is r...
Hayward Baker, North America's leader in geotechnical construction, announces the opening of a new o...
With its unique, award-winning, design resembling a cantilevered stack of books, the Center for Com...
Keller North America provided slope stabilization and deep foundations solutions for culvert constr...
The new office supports Hayward Baker customers in the Carolinas region, providing comprehensive geo...
Keller, world’s leader in geotechnical solutions, announces the completion of its first interlockin...